High-brightness laser with a large framed screen
Active image at 16:9 · 3.98 × 2.24 m
For deep seating, compare 150–180 inches. Test small letters with the actual lens and room lights.
For a convention session and factory briefing on the same day, confirm the equipment stays at one site or needs a timed transfer.
Active image at 16:9 · 3.98 × 2.24 m
For deep seating, compare 150–180 inches. Test small letters with the actual lens and room lights.
Active image at 16:9 · 3.32 × 1.87 m
Mark blocked seats and each signal run. Decide whether both screens show the same source.
SPICE Arena and Concourse, Bayan Lepas
For a hands-on demo, check camera close-ups, workshop seating and electrical access separately from the exhibition booth.

The brief A factory briefing followed by a supplier talk in the Bayan Baru convention precinct with different venue schedules.
Plan the first handover at factory security and the second through the convention venue’s event door. If the schedules touch, prepare two equipment lists and test each source in its own room.
How we check it For two stops on one day, ask whether the first session can be packed before the second venue’s sound check. Use the hall and factory details to decide whether to reserve separate kits.

Use one close-up feed for the object and a separate slide for the instructions. Check the back-row view with classroom lights on and ask the school which route can receive the stand.




Send hall and exhibitor times separately if the crew must check a main feed and booth playback. Confirm which input each space uses.
For a campus demonstration, give the timetable and building. Check how well a close-up is seen with classroom lights at their normal level.
Bayan Lepas
Bayan Lepas
Bayan Lepas
Bayan Lepas
Bukit Jambul, Bayan Lepas area
For Bayan Lepas, Bayan Baru, Relau, Sungai Ara, Bukit Jambul and nearby areas, send the event pin and your preferred setup and collection times.
Record the real handover time between the convention room and the factory briefing. If that window cannot fit unloading, registration and a test, leave a smaller screen waiting at the second stop.
Share the exhibition and factory addresses with a separate handover for each. If the same setup must move, allow for security clearance and a second image test.